MIL-T-85472A(AS)
Room ambient up to 90 percent relative
d. Humidity
humidity
volts ac,
Hz
Input Power
e.
30 (+2, -O) volts dc
4.3.1 Performance characteristics.
The test set shall satisfy the
requirements for interference control (see 3.3.5) and warm-up time (see 3.3.3)
before testing.  During inspection acceptance testing the equipment shall
satisfy the requirements of Section 3.
4.4 First article inspection.  First article tests shall be made on a test
set representative of the production test sets to be supplied under the
First article test performance shall be the responsibility of the
contract.
contractor and shall be performed in accordance with approved test procedures
(see 4.14).  No first article inspections shall be conducted prior to approval
of the first article test procedure by the procuring activity.
4.4.1 Scope of first article tests.  First article tests shall include all
tests deemed necessary by the procuring activity to determine that the
equipment meets all the requirements of this specification and the contract.
These shall include environmental and interference tests in accordance with
MIL-T-5422 as specified in MIL-T-28800.  Test methods shall be in accordance
with MIL-STD-810 except as modified by this specification.
4.4.2 First article approval.  Approval of the first article shall be done by
the procuring activity upon satisfactory completion of all tests.
4.4.3 Production test sets.  Test sets supplied under the contract shall,
in all respects including design, construction, workmanship, performance and
quality, be equal to the approved first article sample. Each test set shall be
capable of successfully completing the same test as imposed on the first
article sample.
4.5  Quality conformance inspection.  The contractor shall furnish all samples
and shall be responsible for accomplishing the quality conformance tests.  All
inspection and testing shall be to the approved quality conformance test
procedures under the supervision of the Government inspector.
a.
Individual test (see 4.5.1)
b.
Sampling test (see 4.5.2)
c.
Special tests (see 4.5.4)
4.5.1 Individual tests.
Each test set submitted for acceptance shall be
subjected to the individual tests.  Those tests shall be adequate to determine
compliance with the requirements of material, workmanship, operational
adequacy and reliability.  As a minimum, each test set accepted shall have
passed the following tests:
a.
Examination of product
(see 4.5.1.1)
b. Operational test
(see 4.5.1.2)
c.
(see 4.5.1.3)
Manufacturing run-in test