Click here to make tpub.com your Home Page

Page Title: Preproduction and first production inspection
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-V-62008B(AT)
inspection plan are being properly applied and (b) Government product inspection to measure
quality of product offered for acceptance. Deviation from the prescribed or agreed-upon
procedures that might have an effect upon the quality of the product, will immediately be called
to the attention of the contractor. Failure of the contractor to promptly correct deficiencies
discovered shall be cause for suspension of acceptance until corrective action has been made or
until conformance of product to prescribed criteria has been demonstrated.
4.1.3 Parts and components. Parts, components, assemblies and installations shall be
inspected in accordance with the drawings listed on EPL 8736334 and Master list of
Supplementary Quality Assurance Provisions 8736334 (see 3.4).
4.1.4 Qualified products and materials. The contractor's inspection records shall be
checked to determine contractor conformance to 3.3.1 and 3.3.2.
4.1.5 Classification of inspections.
a. Preproduction and first production (see 4.2).
b. Quality conformance inspection (see 4.5).
4.2 Preproduction and first production inspection.
4.2.1 Preproduction inspection. A preproduction vehicle (see 3.1) shall be inspected to
ascertain vehicle conformance with the requirements of this specification. Inspection shall be
performed at a location approved by the Government. Failure of the preproduction model to
comply with any of the requirements specified shall be cause for refusal by the Government to
conduct a retest until corrective measures satisfactory to the Government have been taken.
4.2.2 First production inspections.
4.2.2.1 Special process inspection. A special process inspection shall be conducted by
the Government representatives during fabrication of the first production vehicle (see 3.2) to
evaluate conformance of materials and workmanship with drawing and specification
requirements.
4.2.2.1.1 Review and evaluation. Review and evaluation of records for processing
procedure, inspection systems, and plan of quality control shall be conducted on the following:
material, welding, surface hardening, heat treating, protective finishes, etc.
4.2.2.1.2 Hull and turret inspection. The hull and turret shall be inspected prior to
covering the weldments with paint or other pertinent components or assemblies.
4.2.2.2 Complete vehicle inspection. To determine conformance to 3.2, contractor shall
perform acceptance and control inspections listed in table VIII on the first completed vehicle.
Subsequent to contractor's inspection the Government will inspect the vehicle at the contractor's
plant.
23

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business