|
| MIL-A-70788A (AR)
W/AMENDEMENT 3
6.5 Approval of equivalent test methods. Prior approval of the Contracting Officer
is required for use of equivalent test methods. A description of the proposed method
should be submitted through the Contracting Officer to: Commander, U.S. Army
Armament Research, Development and Engineering Center, ATTN: SMCAR-QAR-Q,
Picatinny Arsenal, NJ 07806-5000. This description should include but not be limited to
the accuracy and precision of the method, test data demonstrating the accuracy and
precision and drawings of any special equipment required.
6.6 Changes form previous issue. The margins of this specification are marked
with vertical lines to indicate where changes from the previous issue were made. This
was done as a convenience only and the Government assumes no liability whatsoever for
any inaccuracies in these notations. Bidders and contractors are cautioned to evaluate the
requirements of this document based on the entire content irrespective of the marginal
notations and relationship to the last previous issue.
6.7 Subject term (key word) listing.
Ammunition
Cartridge
Container
Tank
Unitizing
Volcano Mines
- 21 -
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |