Click here to make tpub.com your Home Page

Page Title: Order of Precedence
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-B-70511B (AR)
-Cartridge, 5.56mm, M862 Short Range
MIL-C-70725
Training Ammunition
STANDARDS
MILITARY
-Sampling Procedures and Tables for
MIL-STD-105
Inspection by Attributes
-Quality Assurance Terms and Definitions
MIL-STD-109
-Single and Multilevel Continuous
MIL-STD-1235
Sampling Procedures and Tables for
Inspection by Attributes
(Unless otherwise indicated, copies of federal and military
specifications, standards, and handbooks are available from the
Standardization Documents Order Desk, Bldg. 4D, 700 Robbins
Avenue, Philadelphia, PA 19111-5094.)
2.1.2 Other Government documents, drawings, and
publications. The following other Government documents,
drawings, and Publications form a part of this document to the
extent specified herein. Unless otherwise specified, the issues
are those cited in the solicitation.
DRAWINGS
US ARMY ARMAMENT RESEARCH, DEVELOPMENT AND ENGINEERING
CENTER (ARDEC)
(Practice) M2
-Bolt, Automatic Weapon:
11833491
PACKAGING AND MARKING
(Practice) M2
-Bolt, Automatic Weapon:
P11833491
2.1.3 Order of precedence. In the event of a conflict
between the text of this document and the reference cited herein,
the text of this document shall take precedence. Nothing in this
document, however, shall supersede applicable laws and
regulations unless a specific exemption has been obtained.
REQUIREMENTS
3.
3.1 First article.  When specified in the contract or
purchase order, a sample shall be subjected to first article
inspection in accordance with the technical provisions herein
(See 4.2.1 and 6.1.1).
3.2 Materials and construction. The Bolt, Automatic Weapon
(M2 Bolt) shall conform to the materials and construction
requirements specified herein, on drawing 11833491 and drawings
applicable thereto, and shall be in accordance with the
applicable materials and construction processes of MIL-W-13855.
2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business