|
| MIL-C-18244A(WEP)
(g) Preparation of subsystems and component specifications. See 3.5.9.
(h) Design approval test specifications: See 3.5. &
(i) Simulation studies using development models. See 4.2.1.
(j) Automatic flight control system simulation report. See 3.5.5.
(k) Design approval tests.
(l) Design approval test report. See 3.5.6.
(m) Fabrication of Service Test Models -
NOTE: Approval of the procuring activity shall be obtained prior
to fabrication of service test models. In order to decrease procure-
ment lead time, approval may also be requested at this time of
fabrication of prototype models.
(n) Identification of equipment. See 3.5.7.
(o) Flight test procedures. See 3.5.8.
(p) Preliminary flight tests.
(q) Preliminary flight test reports. See 3.5.9.
(r) Performance flight tests.
(s) Contractor's demonstration flight tests.
(t) Performance flight test reperk See 3.5.10.
(u) Fabrication of special maintenance and overhaul tools. See 3.5.11.
(v) Preparation of handbooks.
(w) Tooling for production.
(x) Fabrication of production models.
21
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |