|
| ![]() MIL-C-19087A(OS)
3.5.1.3 Vibration, transportation. The contractors shall show no damage
and shall meet all the performance requirements and product characteristics.
of this specification after being tested as in 4.5.1.4.
3.5.2 Shock, transportation. The contractors shall show no damage and
shall meet all the performance requirements and product characteristics
of this specification after being tested as in 4.5.2.
Temperature and humidity.
3.5.3
3.5.3.1 High temperature and humidity, nonoperat ing. The contractors
shall show no damage and shall meet all the performance requirements and
product characteristics of this specification after being tested as in
4.5.3.1.
3.5.3.2 High t emperature, operating. The contractors shall be capable
of meeting all the performance requirements of this specification while
undergoing the test specified in 4.5.3.2.
3.5.3.3 Low t emperature nonoperating. The contractors shall met all
the performance requirements and product characteristics of this specifi-
cation after being tested as in 4.5.3.3.
3.5.3.4 Low temperature, operating. The contractors shall be capable
of meeting all the performance requirements of this specification while
undergoing the test specified in 4.5.3.4.
3.6 Screw assemblies. Assembly screws shall be tight. The ward "tight"
means that screws shall be tightened in conformance with established stand-
ard engineering practices.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |