Click here to make tpub.com your Home Page

Page Title: Reliability Demonstration
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-C-38418E(AS)
4.4.1.1  Reliability Demonstration - Unless otherwise specified by the
procuring activity (see 6.2), the control assemblies or their components
(see 4.4.1) shall be subjected to the reliability tests specified under
4.6.24, as
applicable.
Reference
MIL-STD-781
section
entitled
"'Qualification Phase of Production Reliability Tests." The Accept-Reject
Criteria for Test Plan III shall be used (3.5.3).  Test level F shall be
used,  except that the temperature extremes shall be +55C and -44C,
In the event of a reject decision, the
and vibration shall be 0.5g.
samples will be considered unacceptable and the testing shall be stopped
immediately until further notice from the procuring activity.
4.4.2  First Article Test Report - A First Article Test Report shall be
prepared in accordance with MIL-STD-831 and two complete copies of the
report  shall be made available to  the procuring activity.
Prior to
performing  the  First  Article  testing,  the  contractor  shall  obtain
procurement activity approval of the test plan (see 3.1).
4.5
Quality Conformance Inspections - Quality conformance inspections
shall consist of examinations and tests performed on the production items
to determine that they meet the requirements of the following tests:
a.
Individual tests (4.5.1).
b.
Sampling plan tests (4.5.2).
Reliability Assurance Tests (4.5.3).
c.
4.5.1  Individual Tests -  Each control  assembly or  component, as
applicable, shall be subjected to the following tests as described. under
Section 4.6:
Displacement Gyrscope (4.6.2)
a.
Examination of product (4.6.1).
(1)
(2)
Erection cycle and accuracy (4.6.2.1).
(3)
Power Interruption (4.6.2.1.1).
(4)
Heading rotation (4.6.2.2).
(5)
Heading drift rate (4.6.2.3).
(6)
Vertical drift rate (4.6.2.4). .
Erection rate (4.6.2.5).
(7)
Fast erection (4.6.2.5.1).
(8)
35

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business