| MIL-C-45574B(AR)
(3) Significant changes have been made in a manufacturing process or
material.
(4) A design change is made.
Note: The determination to the significance of the action with
regard to the requirement for testing shall be made by the
Product Assurance element of the procuring activity.
h.
The serial numbers for the cannon and components.
i.
List of inspection equipment, responsibility for acquisition.
maintenance, and disposition thereof, if other than as specified (see
4.5.2).
j.
Availability of inspection equipment from the Government.
k. Extent of contractor's responsibility for Government furnished and for
contractor-required final inspection equipment.
l. Applicable acceptance test procedures.
m. When a proof firing sampling plan is authorized, the proof firing
sampling plan parameters: initial consecutive quantity (i), and
sampling frequency (f) (see 4.5.9.1).
n. The levels of preservation, packaging, and packing required for
cannon assemblies (see 5.1) and repair parts (see 5.2).
o.
When applicable, bar code marking requirements (see 5.3).
p. When warranted, the application of MIL-Q-9858 or MIL-I-45208, as
appropriate.
q. Unless otherwise specified, the application of MIL-I-45607 and
MIL-STD-45662.
r. Replacement parts should be provided to Government Proving Grounds and
Watervliet Test Facilities to support the replacement of parts
required after testing.
s. Reliability and Maintainability (RAM) tests and test methods shall be
specified when required as part of FA-IPT.
6.3 Consideration of Data requirements. The following data requirements
should be considered when this specification is appliedd h a contract. The
applicable Data Item Descriptions (DIDs) should be reviewed in conjunction
with the specific acquisition to ensure that only essential data are
requested/provided and that the DIDs are tailored to reflect the requirements
of the specific acquisition. To ensure correct contractual application of the
16
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |