Click here to make tpub.com your Home Page

Page Title: Level X - industrial
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-C-45574B(AR)
5.3.2 Level X - industrial.  Marking of the unit package, intermediate
packages, and exterior shipping containers shall be in accordance with ASTM
03951. When specified (see 6.2), bar code marking shall be in accordance with
MIL-STD-129 and MIL-STD-1189.
6. NOTES
(This section contains information of a general or explanatory nature that may
be helpful, but is not mandatory.)
6.1 Intended use.  The cannon specified herein is intended to provide a
vehicle mounted means for firing both conventional rounds of ammunition and
rockets in close combat support of troops. The 152MM M81E1 gun launcher is
used on the M551 Armored Reconnaissance Airborne Assault Vehicle. The 152MM
M162 gun launcher is used on the M60A2 tank.
6.2 Acquisition requirements.
Acquisition documents must specify the
following:
a. Title, number and date of the specification.
a.
b.
b. Issue of DODISS to be cited in the solicitation, and if required, the
specific issue of individual documents referenced (see 2.1 and 2.2).
c. Requirements for and the number of cannon, components thereof, or
both to be submitted for first article by the contractor (see 3.2).
d. The examinations and tests to be performed by the contractor and the
examinations and tests to be performed by the Government.
e. All inspection and test data that is required.
f.
At whose expense a retest may be performed.
g. Any additional or extended examinations and tests beyond the scope of
this specification should be specified and identified as a separate
item of the contract including, but not limited to, First Article -
Initial Production Testing (FA-IPT). FA-IPT tests shall be conducted
on cannon, critical assemblies, and components when:
(1) A new contractor is utilized.
(2) A time lapse of one year has occurred since the item was last
produced by the contractor.
15

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business