Click here to make tpub.com your Home Page

Page Title: First Article Initial Production Test (FA-IPT)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
......
........................,
I
MIL-C-45978A(AR)
APPENDIX A
40.1  First Article Initial Production Test (FA-IpT)
When
specified in the contract (see 6.2), first article cannon shall
be subjected to first article initial production testing (FA-IPT)
by a Government activity to assure compliance with the
requirements of this specification and the contract.
40.1.1 Sample.  Two first article cannon shall be randomly
selected from the first month's production.   First article cannon
and parts thereof shall be representative of the production
processes to be used during quantity production.  When specified,
two additional cannon shall be included for RAM-D testing (see
Appendix B, 40.1.1).
40.1.2  Inspection Provisions.  First article cannon shall be
subjected to normal inspection per applicable item QAP's, quality
conformance inspection (see 4.7) including proof acceptance (see
4.7.6) , and any additional requirements listed in the contract.
40.1.2.1 Physical Configuration Audit.  One cannon selected from
the first article sample shall undergo a physical configuration
audit in addition to the normal inspection cited in 40.1.2.
Proof Acceptance Through Proof Firinq.  First article
40.1.2.2
cannon shall have successfully passed proof acceptance (see
4.7.6) prior to commencement of First Article Initial Production
Testing.
40.1.3 Tests.  Unless otherwise specified herein or in the
contract, first article cannon tests listed in this specification
shall be performed in a fully operational Howitzer, Light, Towed,
105mm:M204, and shall not normally be integrated with other
tests.  Integration with Operational Testing by the user is
allowable provided all components of the system conform to
technical requirements.
40.2 Tests.
40.2.1
roof Firing Test.  The test method for the proof firing
are contained in 4.7.7.3.1.
cl imatic Test.  A climatic test shall be conducted on two
40.2.2
cannon using the test method of 40.3.1.  If the requirements of
30.3 are not complied with, acceptance shall be deferred and 40.4
shall apply.
40.2.3 RAM-D Tests.  The tests to verify the RAM-X) requirements
are contained in Appendix B.
" 18

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business