Click here to make tpub.com your Home Page

Page Title: Quality Assurance Provisions
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-C-46553B
3.13.1 Process Defects. - The cartridge shall be free of defects such as
folds, wrinkles, buckles, cracks, splits, severe scratches, cuts, dents,
perforations, and other forms of substandard workmanship.
3.13.2 Cleanliness.-The cartridge and its components shall be free of
all foreign matter.  (see 6.7)
4.
QUALITY ASSURANCE PROVISIONS
4.1 Responsibility for Inspection. - Unless otherwise specified in the
contract or purchase order, the supplier is responsible for the per-
formance of all inspection requirements as specified herein. Except
as otherwise specified in the contract or order, the supplier may use
his own or any other facilities suitable for the performance of the in-
spection requirements specified herein, unless disapproved by the Govern-
ment .  The Government reserves the right to perform any of the inspections
set forth in the specification where such inspections are demmed necessary
to assure supplies and services conform to prescribed requirements.
4.1.1  Quality Assurance Terms and Definitions .-Reference shall be made
to MIL-STD-109 for definition of quality assurance terms.
4.2 Classification of Inspections. - The inspection requirements specified
herein are classified as follows:
1.
First Article Inspection (see 4.3).
2.
Quality Conformance Inspection (see 4.4).
4.3 First Article Inspection.
4.3.1 First Article Sample. -At the beginning of production, a sample
representative of the production material, equipment, process and procedures
shall be submitted in accordance with contract requirements and shall consist
of 380 cartridges.  Prior to approval of the first article sample, the
acquisition of material or components for, or the commencement of production of
the balance of the contract quantity shall be at the sole risk of the contractor.
4.3.1.1 First Article Inspection. - Prior to submission of the first article
sample to the Government, the contractor shall inspect all components and
assemblies for all contract, drawings and specification requirements. The
contractors inspection shall be subjected to verification by the Government
representative.
4.3.1.2 Examination and Tests. -The first article sample will be inspected
for all requirements of the drawings and specifications at a Government
laboratory or such facility specified in the contract, Determination as to
4

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business