Click here to make tpub.com your Home Page

Page Title: First article
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-C-48868E (AR)
The reference round group shall consist of 25 rounds of the
same zone, configuration, and conditioning as the test round
except that loaded containers from an accepted lot shall be
used.  The reference group shall be fired after dry swabbing
from the same tube used for the test groups.  If no hangup
occurs in the reference group, the test lot shall be referred.
The test lot shall also be rejected if one or more rounds
exhibit secondary flame at any zone or flaming debris reach the
ground during zone 4 firing.  All other flaming debris results
shall be reported for information only.  A formal firing report
is required (see 6.9).
4.5.3.1
First article.  One hundred and seventy five test
rounds shall be ballistically tested.  These rounds shall
consist of seven groups.  Each group shall be zone fired in the
sequence indicated as follows:
Group
M204 Zone
Test Rounds
1
1
25
2
2
25
3
3
25
4
4
25
5
1
25
6
2
25
7
1
25
4.5.3.2  Production.  Fifty test rounds shall be
ballistically tested.  These rounds shall consist of two
groups.  Each group hall be zone fired in the sequence
indicated as follows:
Group
M204 Zone
Test Rounds
1
1
25
2
4
25
33

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business