Click here to make tpub.com your Home Page

Page Title: Notes
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-C-50242(MU)
5.2 Packing
5.2.1 Level C.- The body assembly preserved and packaged as specified in
5.1.1, shall be packed for shipment in accordance with MIL-STD-1169.
5.3 Marking.- Marking of the carton shall be in accordance with MIL-STD-1169.
5.4 Shipping .- When shipments from more than one lot are shipped as a carload
each lot shall be kept separate, and the division between lots clearly indicated
to prevent mixing of the lots in transit.
6.
NOTES
6.1 Ordering data.- Procurement documents shall specify the following:
Title, number and date of this specification.
Data cards shall be prepared for each lot in accordance with the
information specified in Standard MIL-STD-1167.
c.  Provisions for submission of first article samples.
6.2 Inspection code numbers.- The five-digit code numbers assigned to the in-
spections herein are to facilitate future data collection and analysis by the
Government.  These code numbers are also used to correlate the characteristics
cited on Equipment Lists with the inspections listed in this specification.  These
Code Numbers shall be listed on drawings of equipment designs submitted by the
contractor (See 6.3.5).
6.3 Inspection equipment.- The contractor shall design inspection equipment
as required by the referenced Equipment Lists (EL) in accordance with the
instructions of Paragraphs 6.3.1 through 6.3.5.
6.3.1 Equipment Lists.- Equipment lists indicate the availability of
inspection equipment designs by showing in the "Part Number" column of the
list of inspection equipment (Form SMUPA1010) the numbers of drawings or Federal
Stock numbers of existing equipment designs, or codes as indicated in paragraph
6.3.2.  Design action required of the contractor is described in paragraphs
6.3.3 and 6.3.4.  The contractor will be required to prepare detailed drawings
in accordance with 6.3.4 for all the equipment coded as "Contractor Design" in
the "Part Number" column.  These contractor designs must be approved by the
Government prior to fabrication or procuring of the equipment.  Designs shall be
submitted for approval as specified in 6.3.5.
6.3.2 Equipment List Codes.- The inspection equipment as defined in 6.3.3
and 6.3.4 will be designated in the EL by the following codes:
CD - Contractor design on controlled contractor format
and/or commercial equipment.
MU - Army design, mandatory for use.
10

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business