|
| MIL-C-50779A(AR)
4.3 First article inspection.
4.3.1 Submission. The contractor shall submit a first
article sample as designated by the Contracting Officer for
evaluation in accordance with provisions of 4.3.2. The first
article sample shall consist of the items as required per Table
1.
4.3.2 Inspections to be performed.
See MIL-A-48078 and
Table 1 specified herein.
4.3.3 Rejection.
See MIL-A-48078.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |