MIL-C-52973A(ME)
Table I.
Examination schedule
(Cont'd)
Tests.
4.5.2
4.5.2.1
Test conditions.
Prior to test, the compressor shall be lubricated
with military OilS and greases,
0ils shall be those designated for use in
ambient temperature at place of test.  The compressor unit shall operate as
specified herein without maintenance other than the contractor's recommended
normal scheduled maintenance as established by a maintenance schedule prepared
and submitted by the contractor prior to test.
Unless otherwise specified
herein,  tests shall be conducted with all compressor unit components and
accessories,  including the air intake extension, installed and functioning
normally.
Capacity shall be determined in accordance with ASME Performance Test
Code (PTC-9) or by calculating capacity based on a weight of air delivered in a
given time.
Condensate removed from the air shall not be included as part of the
compressor capacity.
If the weight method is used, the reservoir (minimum volume
1000 cubic inches) shall be filled to 3200 plus or minus 100 psig, and the
capacity shall be deter-mined by the following formula: