Click here to make tpub.com your Home Page

Page Title: Responsibility for inspection.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-C-60813(AR)
3.11  Function and casualty. - The cartridge shall function without
casualty.
3.12  Airtight of base closure seal. - The bullet shall not release more
than one bubble-of air under the application of a pressure differential of
2 psi.
3.13 Workmanship.- The requirements for workmanship are as specified on
applicable drawings, referenced specifications and the following:
3.13.1 Metal defects.- The cartridge shall be free of folds, wrinkles,
deep draw scratches, scaly metal, dents and other defects.
3.13.2 Foreign matter.- The cartridge shall be free of corrosion, stains,
discolorations, dirt, oil and smears of lacquer.
4. QUALITY ASSURANCE PROVISIONS
4.1 Responsibility for inspection.- Unless otherwise specified in the
contract or purchase order, the supplier is responsible for the performance
of all inspection requirements as specified herein. Except as otherwise
specified, the supplier may utilize his own facilities or any commercial
laboratory acceptable to the Government. The Government reserves the right
to perform any of the inspections set forth in the specification where such
inspections are deemed necessary to assure suppliers and services conform to
prescribed requirements.
4.1.1 Quality assurance terms and definitions.- Reference shall be made
to MIL-STD-109 for definition of quality assurance terms.
4.2 First article sample.
4.2.1 Initial production sample.- At the beginning of regular production,
a sample shall be submitted in accordance with contract requirements and shall
consist of 600 cartridges. The sample shall be manufactured using the same
materials, equipment processes and procedures as will be used in regular Pro-
duction. All parts and materials, including packaging and packing shall be
the same as used for regular production and shall be obtained from the same
source of supply.
4 .2.1.1 Examination and test.- After inspection and provisional accept-
ance at source,the sample shall be inspected for all requirements of the
drawings and specifications at a government laboratory or such other facility
specified in the contract.
3

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business