|
| MIL-C-63550E(AR)
3.3.5.1 Insulation stripping. Removal of insulation from electrical wire
conductors, 12 AWG and smaller, and from outer jackets of shielded cables
shall be performed so that there is no evidence of physical damage to the
individual wire or braided strands.
4. QUALITY ASSURANCE PROVISIONS
4.1 Responsibility for inspection. Unless otherwise specified in the con-
tract or purchase order, the contractor is responsible for the performance of
all the quality assurance provisions specified in section 4 to determine con-
formance to the requirements of sections 3 and 5. Except as otherwise speci-
fied, the contractor may utilize his own facilities or any commercial labora-
tory-acceptable to the procuring activity (see 6.2). The procuring activity
reserves the right to perform or witness any of the inspections set forth in
this document where such inspections are deemed necessary to assure supplies
and services conform to prescribed requirements. The contractor will not be
restricted to the inspections or the methods of inspection defined herein,
provided that an equivalent control, approved by the procuring activity, is
utilized.
4.1.1 Inspection equipment. Unless otherwise specified in the contract.
the contractor is responsible for the provisions and maintenance of all
inspection and test equipment necessary to assure that supplies and services
conform to contract requirements. Commercial, modified commercial, or
contractor-designed inspection equipment or measuring setups must be capable
of repetitive measurements to an accuracy of 10 percent of the component
tolerance. Calibration of inspection and test equipment shall be in accor-
dance with MIL-C-45662. Where compliance with MIL-C-45662 is not possible,
special calibration requirements shall be prepared for approval by the pro-
curing activity.
4.1.2 Special tests and examinations. Special tests and examinations (see
6.3), when required, shall be performed in accordance with tables II and III.
The inspection sequence shall be in accordance with table II.
Note:
Assemblies subjected to special tests and examina-
tions shall not be used for any other purposes and
shall be indelibly marked, DO NOT USE.
4.1.2.1 Preproduction. If required by the procuring activity (see 6.2),
two assemblies shall be inspected by the contractor at a location approved by
the procuring activity.
4.1.2.1.1 Preproduction failure. Failure of a preproduction assembly to
meet the requirements specified herein shall be cause for cessation of inspec-
tion. When corrective measures satisfactory to the procuring activity have
been taken, inspection may be continued.
19
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |