Click here to make tpub.com your Home Page

Page Title: Table II. Sequence of special tests and examinations.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-C-63550E(AR)
Sequence of special tests and examinations.
TABLE II.
Initial
Prepr-
production
duction
sample
sample
Paragraph
Test sequence
number
1
1
2
2
Design and construction
4.3
x
x
x
x
Physical characteristics
x
x
4.2.2
x
x
Performance
4.2.1
x
x
x
x
4.2.3.1
Humidity
x
x
x
x
4.2.3.2.1
x
x
Low temperature
x
x
4.2.3.2.2
High temperature
x
x
x
x
Storage temperature
4.2.3.3
x
x
x
x
4.4.
Packaging
x
x
x
x
4.1.2.2 Initial production.  Unless otherwise specified, the procuring
activity shall select two assemblies from the first 10 assemblies produced
under a production contract (see 6.2). Once verification and validation of
compliance with the requirement has been accomplished, quality conformance
inspection of the remainder of the production contract shall be as specified
(see 4.2).
4.1.2.2.1 Initial production failure.  Failure of an initial production
assembly during or as a result of initial production inspection shall be cause
for rejection of the assembly. The procuring activity shall refuse acceptance
of production assemblies until evidence of corrective action is provided.
20

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business