| MIL-C-63990C (AR)
6.5 Drawings. Drawings listed in Section 2 of this speci-
fication under the heading U.S. Army Armament, Research, Develop-
ment and Engineering Center (ARDEC) may also include drawings
prepared by, and identified as U.S. Army Armament, Research and
Development Command (ARRADCOM), Frankford Arsenal, Rock Island
Arsenal or Picatinny Arsenal drawings. Technical data originally
prepared by these activities is now under cognizance of ARDEC.
6.6. Submission of test data.In addition to the normal
distribution of records, when the cartridge is procured by the
U.S. Army,one (1) copy of all ballistic data and the ammunition
data card for each lot should be forwarded to: Commander, ARDEC,
ATTN: SMCAR-QAF-S, Picatinny Arsenal, NJ 07806-5000.
6.7 Submission of detailed inspection 6.7 plan for review. The
detailed inspection plan for the cartridge should be submitted to.
the responsible U.S. Government quality assurance element.
6.8 Subject term (key word) listing.
Ammunition
Bullet
Small Arms
Testing
6.9 Submission of alternative quality conformance
provisions .Unless otherwise specified inthe contract, proposed
alternative quality conformance provisions will be submitted by
the contractor for evaluation by the technical activity respon-
sible for the preparation of this specification.
6.10 Changes from previous issue. Asterisks (or vertical)
lines) are not used in this revision to identify changes with
respect to the previous issue due to the extensiveness of the
changes.
Preparing activity:
Custodian:
Army-AR
Army-Al?
(Project 1305-AE81)