Click here to make tpub.com your Home Page

Page Title: Responsobility for inspection
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-C-70490(AR)
4.
QUALITY ASSURANCE PROVISIONS
4.1 Responsobility for inspection. Unless otherwise
specified In the contract or purchase order the contractor is
responsible for the performance of all inspection requirements as
specified herein. Except as otherwise specified in the contract
or purchase order, the contractor may use his own or any other
facilities suitable for the performance of the inspection
requirements specified herein, unless disapproved by the
Government. The Government reserves the right to perform any of
the inspections set forth in this specification where such
inspections are deemed necessary to assure supplies and services
conform to prescribed requirements.
4.1.1 General provisions. The component and subassembly
inspection requirements of MIL-F-13926 and MIL-STD-454 form a part
of the Quality Assurance Provisions of this specification.
Definitions of inspection terms shall be as listed in MIL-STD-109.
4.2  First  article  (initial  production)  approval.  The
requirement for first article approval and the reponsibility
(Government or contractor) for first article testing shall be as
specified in the contract. The sample for first article approval
test shall consist of three (3) memory plus three (3) each of all
items covered by QAP. The three memory's shall be tested as
specified herein for all the requirements of this specification.
The items covered by QAP shall be tested, as specified thereon,
for all characteristics delineated on the QAP. The samples shall
be manufactured in the same manner, using the same materials,
equipment, processes, and procedures as will be used in the
production of the balance of the contract quantity. All parts and
materials, including packaging and packing, shall be obtained from
the same source of supply as will be used in the production of the
balance of the contract quantity.
4.2.1 Government testing.  When the Government is responsible
for conducting first article approval tests, the contractor prior
-
to submitting-the sample to the Government, shall inspect the
sample to insure that it conforms to all requirements of the
contract and  submit a record of this inspection with the sample,
including certificates of conformance for all materials.
4.2.2 Contractor testing.  When the contractor is responsible
for conducting first article approval tests, the sample shall be
inspected by the contractor for all the requirements of the
contract. The sample and a record of this inspection, including
certificates of conformance for all materials, shall be submitted
to the Government for approval. The Government reserves the right
to witness any or all of the contractor's inspections.
11

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business