Click here to make tpub.com your Home Page

Page Title: Government furnished inspection equirement.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-C-70496(AR)
4.5  Inspection  equipment.  Except  as  otherwise  provided  for  by
the contract, the contractor shall supply and maintain inspection
equipment in accordance with the applicable requirements of
MIL-I-4507.
4.5.1 Government furnished inspection equirement. Where the
contract provides for Government furnished test equirement, supply
and maintenance of test equirpment shall be in accordance with the
applicable requirements specified in MIL-1-45607.
Contractor furnished inspection equipment.
4.5.2
4.5.2.1  Government  design.  All  inspection  equipment  specified
by drawing number in specification or QAP forming a part of the
contract shall be supplied by the contractor in accordance with
technical data included in the Technical Data Package List (TDPL).
In the absence of Government
4.5.2.2  Contractor  desiqn.
inspection equipment design, the contractor shall design and supply
inspection equipment compatible with the "Test Methods and
Prodecures" specified in 4.6 of this specification and with the
component inspection procedures specified in "Examination" and
"Test Facilities" requirements of MIL-F-13926. Since tolerance of
test equipment is normally considered to be within 10% of the
product tolerance for which it is intended, this inherent error in
the test equipment design must be considered as part of the
prescribed product tolerance limit. Thus, concept, construction,
materials, dimensions, and tolerance used in the design of test
equipment shall be so selected and controlled as to insure that the
test equipment will reliably indicate acceptability of a product
which does not exceed 90% of the prescribed tolerance limit, and
permit positive rejection when non-conforming. Construction shall
be such as to facilitate routine calibration of test equipment.
Inspection equipment desiqn requirements.
4.5.2.3
The volume of the test chamber
4.5.2.3.1  Temperature  testinq.
shall conform to the test facilities requirements of MIL-F-13926.
The air temperature at the control sensor shall be in accordance
with the specified requirements within plus or minus 2.5F
(1.4C). The temperature gradient across the cross-sectional
area occupied by the test item shall not exceed 0.5F per foot in
any direction. The heat source of the test chamber shall be so
located that radient heat, if used, will not fall directly on the
test item. Thermocouples or equivalent temperature sensors
utilized to determine or control the specified chamber temperature
shall be centrally located within the test chamber within the
supply airstream, or in the return airstream,whichever provides
the specified test condition at the item under test and shall be
baffled or otherwise protected against ratilation effects.
9

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business