Click here to make tpub.com your Home Page

Page Title: Examination and tests.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-C-70497(AR)
4.1.1  General  provisions.  The component and subassembly
inspection requirements of MIL-F-13926 and MIL-STD-454 form a
part of the Quality Assurance Provisions of this specification.
Definitions of inspection terms shall be as listed in MIL-STD-109.
4.2  First  article  (initial  production)  approval.  The
requirement for first article approval and the responsibility
(Government or contractor) for first article testing shall be as
specified in the contract. The sample for first article approval
test shall consist of three (3) interconnect plus three (3) each
of all items covered by QAP. The three interconnect shall be
tested as specified herein for all the requirements of this
specification. The items covered by QAP shall be tested, as
specified thereon, for all characteristics delineated on the QAP.
The samples shall be manufactured in the same manner, using the
same materials, equipment, processes, and procedures as will be
used in the production of the balance of the contract quantity.
All parts and materials, including packaging and packing, shall be
obtained from the same source of supply as will be used in the
production of the balance of the contract quantity.
4.2.1 Government testinq.  When the Government is responsible
for conducting first article approval test, the contractor prior
to  submitting  sample  to  the  Government,  shall  inspect  the
sample to insure that it conforms to all requirements of the
contract and submit a record of this inspection with the sample,
including certificates of conformance for all materials.
4.2.2 Contractor testinq.  When the contractor is responsible
for conducting first article approval tests, the sample shall be
inspected by the contractor for all the requirements of the
contract. The sample and a record of this inspection, including
certificates of conformance for all materials, shall be submitted
to the Government for approval. The Government reserves the right
to witness any or all of the contractor's inspections.
4.3
Inspection
provisions.
4.3.1 Submission of product. Unless otherwise specified by
the contracting officer, inspection lot size, lot formation, and
presentation of lots shall be in accordance with "Submission of
Product"  provision  of  MIL-STD-105.
4.3.2 Examination and tests.
4.3.2.1 Components and subassemblies. All
components and
subassemblies shall be inspected in accordance with the inspection
provisions contained in Quality Assurance Provisions (QAP's)
listed in the Technical Data Package (TDP). In the absence of
QAP's, the applicable Quality Assurance Provisions of MIL-F-13926
shall apply.
6

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business