|
| MIL-C-70509(AR)
The test shall be conducted in
4.5.4 Chamber pressure.
accordance with DOD-STD-1468.
4. 5.5 Waterproof.
The test shall be conducted in accordance
with DOD-STD-1468 Type II Test.
If for any reason the proving ground
4.5.6 Test validity.
considers that the test conditions have detrimentally affected the
test results, the test shall be declared invalid and a new test
shall be performed with additional samples.
5.
PREPARATION FOR DELIVERY
Level A (World Wide Shipment). The cartridges
5.1 Packing.
shall be packed in accordance with Drawing 9378266.
5.2 Marking and labeling. Packing boxes shall be marked and
labeled in accordance with the applicable drawings cited in 5.1.
6.
NOTES
6.1 Ordering data. Procurement documents shall be in
accordance with MIL -A-48078 and shall include the following:
a. Provisions for the supply, maintenance and disposition of
mandatory ballistic test equipment for acceptance inspection
purpose .
b. Provisions for the submission of acceptance inspection
reports containing final inspection results for each lot of
ammunition presented to the Government.
6.2 Submission of inspection equipment designs for approval.
See MIL-A-48078. Submit equipment designs as required to
Commander, AMCCOM, Dover, NJ 07801-5001, ATTN: AMSMC-QAF-I(D).
6.3 Drawings. Drawings listed in Section 2 of this
specification under the heading US Army Armament Research and
Development Center (ARDC) may also include drawings prepared by,
and identified as US Army Armament Research and Development
Command (ARRADCOM), Edgewood Arsenal, Frankford Arsenal, Rock
Island Arsenal or Picatinny Arsenal drawings. Technical data
originally prepared by these activities is no under the cognizance
of ARDC.
Preparing Activity:
Custodian:
Army-AR
Army-AR
(Project No 1305-AB27)
12
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |