|
| MIL-C-70785 (AR)
The standard deviation of impacts in both
3.7 Dispersion.
the horizontal and vertical directions of the sample cartridge
projectiles shall not exceed 0.60 milliradians when the cartridges
are conditioned at 21 3C (see 4.4.5). For this test ,the
test barrel will be fitted and fired with a muzzle brake.
3.8 Action time. The action time of the sample cartridges
shall not exceed 6.0 ms when conditioned at 21 3C (see
4.4.6).
3.9 Projectile trace. The projectile trace shall exhibit a
visible trace when viewed against a dark background for the
minimum 3.5 seconds (see) from the gun muzzle at a temperature of
21 -- 3C (see 4.4.7).
+
3.10 Function and casualty. The sample cartridges, at 21
3C, shall function without firing defects and casualties (See
4.4.8).
3.11 Workmanship. All parts and assemblies shall be
fabricated, loaded, and assembled in a thorough workmanship
manner . They shall be free of burrs, sharp edges, cracks,
scratches dents, folds, wrinkles, buckles, dirt, grease, oil,
rust, and other foreign matter. The cleaning method used shall
not be injurious to any parts, nor shall the coatings be
continuous; hawever, light scratches not exposing base material
may be permitted. All required marking and stamping shall be neat
and clearly defined.
4.
QUALITY ASSURANCE PROVISIONS
4.1 Responsiblity for inspection. Unless otherwise specified
in the contract, the contractor is responsible for the performance
of all inspection as specified herein.Except as otherwise
specified in the contract, the contractor may use his own or any
other facilities suitable for the performance of the inspection
requirements specified herein, unless disapproved by the
Government. The Government reserves the right to perform any of
the inspections set forth in the specification where such
inspections are deemed necessary to assure supplies and services
conform to prescribed requirements. Quality assurance terms and
definitions shall be in accordance with MIL-STD-109 and the
provisions of MIL-A-48078 shall apply.
4.1.1 Responsiblity for compliance. All items must meet all
requirements of sections 3 and 5. The inspection set forth in
this specification shall become a part of the contractor's overall
inspection system or quality program. The absence of any
inspection requirements in the specification shall not relieve the
4
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |