|
| MIL-C-70785 (AR)
just prior to a firing test or after a firing test (and the defect
is not due to the firing), the lot shall be rejected. The lot
shall then be rescreened and resubmitted for visual inspection of
critical defets. If a critical defect is found during packing,
the portion of the lot that has been packed or is in the process
of being packed shall be rejected. In addition, the portion of
the lot remaining to be packed shall be rejected. The lot shall
then he rescreened and resubmitted for visual inspection of
critical defects.
b. Major and minor defects shall be performed on a class
basis in accordance with classification of defects using
applicable sampling plans and acceptance criteria of MIL-STD-105.
All nonconforming cartridges shall be rejected. The following
AQL's are assigned to major and minor defects:
Major .............................. 0.25%
Minor .................................. 0.40%
6
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |