Click here to make tpub.com your Home Page

Page Title: Technical manuals.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-D-16196E(SH)
The
The above DID's were those cleared as of the date of this specification.
current issue of DOD 5010.12-L, Acquisition Management Systems and Data
Requirements Control List (AMSDL), must be researched to ensure that only
current , cleared DID's are cited on the DD Form 1423.
The requirements for technical manuals should be
6.4 Technical manuals.
If technical
considered when this specification is applied on a contract.
manuals are required, military specifications and standards that have been
cleared and listed in DoD 5010.12-L, Acquisition Management Systems and Data
Requirements Control List (AMSDL) must be listed on a separate Contract Data
Requirements List (DD Form 1423), which in included as an exhibit to the
contract.
The technical manuals must be acquired under separated contract line
item in the contract.
When first article inspection is required, the
6.5 First article.
contracting officer should provide specific guidance to offerors whether the
item(s) should be a preproduction sample, a first article sample, a first
production items, a
production item, a sample selected from the first
standard production item from the contractor's current inventory (see 3.1), and
The contracting officer
the number of items to be tested as specified in 4.3.
should also include specific instructions in acquisition documents regarding
arrangements for examinations, approval of first article test results, and
Invitations for bids should provide that the
disposition of first articles.
Government reserves the right to waive the requirement for samples for first
article inspection to those bidders offering a product which has been previously
acquired or tested by the Government, and that bidders offering such products,
who wish to rely on such production or test, must furnish evidence with the bid
that prior Government approval is presently appropriate for the pending contract.
Bidders should not submit alternate bids unless specifically requested to do so
in the solicitation.
Provisioning Technical Documentation (PTD), spare
6.6  Provisioning.
parts ,  and repair parts should be furnished as specified in the contract.
6.6.1 When ordering spare parts or repair parts for the equipment covered
by this specification, the contract should state that such spare parts and
repair parts should meet the same requirements and quality assurance provisions
Packaging for such
as the parts used in the manufacture of the equipment.
parts should also be specified.
6.6.2  On board repair parts ,
On
board repair parts are those parts which
should be carried on board Naval ships
for routine maintenance of parent equip-
On board
repair parts should be furnished with
ment by shipboard personnel.
the distillation unit specified herein
and should include the following:
4 set of V-belts.
(a)
(b)
100 percent gaskets.
100 percent gauge, sight, and flowmeter glasses (if used) .
(c)
(d)
1 electric heater.
(e)
1 gauge of each size and type.
(f)
1 thermometer of each size and type (to be furnished by manu-
facturer unless otherwise specified (see 6.2).
24

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business