Click here to make tpub.com your Home Page

Page Title: Technical Manuals
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-D-18641F(SH)
6.4 Technical Manuals. The requirement for technical manuals should be considered when
this specification is applied on a contract. If technical manuals are required, military specifications
and standards that have been cleared and listed in DOD 5010.12-L Acquisition Management
Systems and Data Requirements Control List (AMSDL) must be listed on a separate Contract
Data Requirements List (DD Form 1423), which is included as an exhibit to the contract- The
technical manuals must be squired under separate contract line item in the contract. Technical
content should include the requirements of appendix B, titled `Technical Manual Technical Content
w
Requirements.
6.5 Qualification. With respect to products requiring qualification, awards will be made only
for products which are, at the time of award of contract, qualified for inclusion in Qualified
Products List No. 18641 whether or not such products have actually been so listed by that date.
The attention of the contractors is called to these requirements, and manufacturers are urged to
arrange to have the products that they propose to offer to the Federal Government tested for
qualification in order that they may k eligible to be awarded contracts or purchase orders for
the products covered by this specification. The activity responsible for the Qualified Products List
is the Naval Sea Systems Command, SEA 05Q22, 2531 Jefferson Davis Hwy, Arlington, VA 22242-
5160 and information pertaining to qualification of products may be obtained from that activity.
Application for qualification tests must be made in accordance with "Provisions Governing
Qualification SD-6" (see 6.5.1).
6.5.1 Copies of "Provisions Governing Qualification SD-6" may be obtained upon application
to Standardization Documents Order Desk 700 Robbins Ave., Building 4D, Philadeiphia, PA
19111-5094.
6.6 For saturated steam propelled ship distilling plants, distilling plant manufacturer should
forward the following to NAVSEA:
a. Permanent tube plugging procedure
b. Drawings of the permanent tube plug and tools (including tapered tube plug)
c. Drawings showing the permanent plug and each tool in its proper position in the tube
end or permanent plug.
6.6.1 The drawings and procedures specified in 6.6 should be included in the distilling plant
technical manual.
6.7 Provisioning. Provisioning Technical Documentation (PTD), spare parts, and repair parts.
should be furnished as specified in the contract.
6.7.1 When ordering spare parts or repair parts for the equipment covered by this specification,
the contract should state that such spare parts and repair parts should meet the same requirements
and quality assurance provisions as the parts used in the manufacture of the equipment. Packaging
for such parts should also be specified.
57

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business