|
| MIL-D-18641F(SH)
6.8 Sub-contracted material and parts. The packaging requirements of referenced documents
listed in section 2 do not apply when material and parts are acquired by the contractor for
incorporation into the equipment and lose their separate identity when the equipment is shipped.
6.9 Subject term (key word) listing.
Baffles
Brine
Flange
Flash chamber
Shell
Waterbox
6.10 Changes from previous issue. Marginal notations are not used in this revision to identify
changes with respect to the previous issue due to the extensiveness of the changes.
Preparing activity
Navy - SH
(Project 4620-N034)
58
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |