Click here to make tpub.com your Home Page

Page Title: First three lots
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-D-20505D(AR)
4.4.3.5 Functioning.  The simulator assemblies shall be
observed for any evidence of failures to comply with the
requirements as classified in Table II.
TABLE II
Defect
Classification
Premature (see 3.4.1)
Critical
Sound Level Intensity (see 3.4.2)
Major
Fuse Burning Time of less than
four but more than three seconds
Major
(see dwg. 9234991)
Fuse Burning Time of more than
seven seconds (see dwg. 9234991)
Major
4.4.3.5.1  First three lots.  Beginning with the first lot
produced and continuing until three consecutive lots have complied
with the acceptance criteria specified herein, 125 assemblies-shall
be selected from each lot for this test.  If, during the test, any
assembly exhibits a Critical defect or four (4) or more Major
Defects are encountered, the lot shall be rejected.  The test shall
be performed as specified in 4.5.5.
4.4.3.5.2  After three consecutive lots. After
three
consecutive lots have complied with the criteria of
4.4.3.5.1, a
sample of 50 assemblies shall be selected from each
lot for this
test.  If, during the test, any assembly exhibits a
Critical Defect
or three (3) or more Major Defects are encountered,
the lot shall be
rejected.
4.4.3.6  Quick leak test of sealed barrier bag.  Major Defect.
Ten (10) boxes in sealed barrier bags shall be selected from each
lot for this test.  If two or more packages show evidence of air
leakage during test or water leakage when package is opened, the lot
shall be rejected.  The test shall be performed as specified in
4.5.6.
4.4.4  Inspection equipment.  The inspection equipment required
to perform the examinations and tests prescribed in this section is
identified under the "Method of Inspection" headings in 4.4.2 and in
the procedures in 4.5 (see 6.3).
4.5
Method of inspection.
4.5.1
Moisture content.
4.5.1.1 Moisture content of charge composition. An accurately
weighed portion of three (3) grams (g.) of the charge composition
shall be transferred to a tared moisture dish, The moisture dish and
16

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business