|
| ![]() MIL-D-20505D (AR)
succession of bubbles from any surface or seam shall be cause for
rejection. Where there is no emission of bubbles observed, the
package shall be dried, opened and inspected. Evidence of water
within the barrier, or on the box, shall also be cause for
(Non-destructive test).
rejection.
PACKAGING
5.
5.1 Preservation and Packaging
5.1.1 Level A. The detonation simulator assemblies shall be
preserved and packaged in accordance with dwg. 8853677.
5.2 Packing
5.2.1 Level A. The detonation simulator assemblies shall be
packed in accordance with dwg. 8853678.
Marking shall be as specified on dwg. 8853677 and
5.3 Marking.
8853678.
6. NOTES
6.1 Intended use. The components covered by this specification
are intended for use on the Detonation, Simulator, Explosive, M80.
6.2
Ordering data.
See MIL-A-48078.
6.3 Submission of inspection equipment designs for approval.
(See MIL-A-48078). Submit equipment designs as required, to
Commander, US Army Armament Research and Development Center, ATTN:
DRSMC-QAT-I, Dover, New Jersey 07801.
6.4 Distribution of ammunition data cards. Distribution of
data cards shall include the following: Commander, US Army Armament
Research and Development Center, ATTN: DRSMC-QAT-M, Dover, New
Jersey 07801.
6.5 Drawings. Drawings listed in Section 2 of this
specification under the heading US Army Armament Research and
Development Center (ARDC) may also include drawings prepared by, and
identified as, Edgewood Arsenal, Frankford Arsenal, Rock Island
Arsenal, Picatinny Arsenal, or ARRADCOM drawings. Technical data
originally prepared by these activities is now under the cognizance
of ARDC.
19
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |