|
| ![]() MIL-D-70789A (AR)
TABLE VII.
First article inspection.
Method
Para-
Requirement
Number of
paragraph
graph
Sample Units
Inspection
4.8.7
3.5,3.6,3.8 & 3.10
1
Design
Verification
4.8.5.5
3.7.1.1 & 3.7.1.3
3
Low
Temperature
4.8.5.4
3.7.1.1 & 3.7.1.3
3
High
Temperature
4.8.5.6
3.7.1.2
1
Temperature
Shock
4.8.5.11
3.7.7
1
Washdown
4.8.5.14
3.7.10.2 & 3.7.10.3
1
Shock
4.8.5.15
3.7.11
1
Vibration
4.8.5.16
3.7.14
1
EMI
Quality conformance inspection.
4.7
Examinations and tests.
4.7.1
Classification of characteristics. Quality
a.
conformance examinations and tests shall be as specified in, Table
VIII. The contractor's quality program or detailed ispection
plan shall provide assurance of compliance of all characteristics
with the applicable drawing and specification requirements
utilizing as a minimum the conformance criteria specified herein.
b. Alternative inspection provisions. Alternative
quality conformance procedures, methods or equipment, such as
statistical process control, tool control, other types of
sampling procedures etc., may be used by the contractor when
they provide, as a minimum, the level of quality assurance
required by the provisions specified herein. Prior to applying
such alternative procedures methods, or equipment, the
contractor shall describe them in a written proposal submitted to
the Government for evaluation (see 6.5.2). When required, the
contractor shall demonstrate that the effectiveness of each
proposed alternative is equal to or better than the specified
quality assurance provision(s) herein. In cases of dispute as to
whether the contractor's proposed
101
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |