Click here to make tpub.com your Home Page

Page Title: Inspection equipment designed alternate inspection provisions
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-D-70789A (AR)
6.4  Qualification.  With  respect  to  products  requiring
qualifications, awards will be made only for products which are,
at the time set for opening of bids, qualified for inclusion in
the Qualified Products List (QPL) for the Dynamic Reference Unit
whether or not such products have actually been so listed by that
date. The attention of the contractors is called to these
requirements, and manufacturers are urged to arrange to have the
products that they propose to offer to the Federal government
tested for qualification in order that they may be eligible to be
awarded contracts or purchase orders for the products covered by
this specification. The activity responsible for the Qualified
Products List is ARDEC, SMCAR-BAC-S, Picatinny Arsenal, NJ
07806-5000 and information pertaining to the qualification of
products may be obtained fmm that activity.
6.5 Inspection equipment designed alternate inspection
provisions.
6.5.1  Submission of designs for approval. Contractor
designs for final acceptance inspection shall be approved by the
Government prior to fabrication or procuring the equipment. The
contractor is referred to MIL-HKBK-204 for guidance. Submission
of  design  concept  on  inspection  equipment  is  permisible  for
tentative approval. The completion date for design review will be
based on the date of the final submission of designs and the
required delivery schedule as stipulated in the contract. Submit
designs as required to:  Commander, U.S. Army Armament, Research,
Development  and  Engineering  Center,  SMCAR-QAF-1,  Picatinny
Arsenal, NJ 07806-5000. This address will be specified on the
Contract Data Requirements List DD Form 1423 in the contract.
When the contractor submits inspection equipment designs to the
government for approval, he shall give the following information.
in his letter of transmittal:
The contract number.
a.
The contract item (name model number, etc.).
b.
The designs remaining to be submitted and the
c.
expected date of submittal.
6.5.2 Submission of alternative inspection provisions.
Proposed alternative inspection provisions should be submitted by
the  contractor  to  the  procuring  contracting  officer  f o r
evaluation and approval by the technical activity responsible for
preparation of this specification.
127

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business