|
| MIL-D-70789A (AR)
6.4 Qualification. With respect to products requiring
qualifications, awards will be made only for products which are,
at the time set for opening of bids, qualified for inclusion in
the Qualified Products List (QPL) for the Dynamic Reference Unit
whether or not such products have actually been so listed by that
date. The attention of the contractors is called to these
requirements, and manufacturers are urged to arrange to have the
products that they propose to offer to the Federal government
tested for qualification in order that they may be eligible to be
awarded contracts or purchase orders for the products covered by
this specification. The activity responsible for the Qualified
Products List is ARDEC, SMCAR-BAC-S, Picatinny Arsenal, NJ
07806-5000 and information pertaining to the qualification of
products may be obtained fmm that activity.
6.5 Inspection equipment designed alternate inspection
provisions.
6.5.1 Submission of designs for approval. Contractor
designs for final acceptance inspection shall be approved by the
Government prior to fabrication or procuring the equipment. The
contractor is referred to MIL-HKBK-204 for guidance. Submission
of design concept on inspection equipment is permisible for
tentative approval. The completion date for design review will be
based on the date of the final submission of designs and the
required delivery schedule as stipulated in the contract. Submit
designs as required to: Commander, U.S. Army Armament, Research,
Development and Engineering Center, SMCAR-QAF-1, Picatinny
Arsenal, NJ 07806-5000. This address will be specified on the
Contract Data Requirements List DD Form 1423 in the contract.
When the contractor submits inspection equipment designs to the
government for approval, he shall give the following information.
in his letter of transmittal:
The contract number.
a.
The contract item (name model number, etc.).
b.
The designs remaining to be submitted and the
c.
expected date of submittal.
6.5.2 Submission of alternative inspection provisions.
Proposed alternative inspection provisions should be submitted by
the contractor to the procuring contracting officer f o r
evaluation and approval by the technical activity responsible for
preparation of this specification.
127
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |