Click here to make tpub.com your Home Page

Page Title: Magnetic Drum Memory
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-D-81347C(AS)
Magnetic Drum Memory
3.5.4.4.4.3
General - The Magnetic Drum Memory (MDM) shall be a light-
3.5.4.4.4.3.1
weight medium capacity magnetic drum memory system which provides a digital interface to the drum
cent roller.  The Magnetic Drum Memory shall meet the following requirements.
Functional Operations - The functional operations within the
3.5.4.4.4.3.2
MDM fall into three categories - write operations, read operations, and test operations. These are
described in detail in 3.5.4.4.4.3.3.4.1.
Requirements
3.5.4.4.4.3.3
Parts and Materials - In the selection of parts and materials,
3.5.4.4.4.3.3.1
fulfillment of major design objectives shall be the prime consideration. In so doing, those objectives
outlined in 3.2 shall govern.
Design and Construction - The MDM shall conform with all
3.5.4.4.4.3.3.2
applicable requirements of Specification MIL-E-5400 for design, construction and workmanship,
except as otherwise specified herein.
Weight - The total weight of the MDM, including cables, shall
3.5.4.4.4.3.3.2.1
be a minimum consistent with good design and such as to permit the total Logic Unit 4 weight to meet
the requirement of 3.3.1. To achieve this, a total weight of 85 pounds shall be considered a design
objective.
Reliability - The reliability program for the MDM shall be in
3.5.4.4.4.3.3.2.2
accordance with 3.3.2.1.
Operational Stability - The MDM shall operate with specified
3.5.4.4.4.3.3.2.2.1
performance continuously or intermittently for a period of at least 10, 000 hours without the need for
servicing other than replacement of failed components.
Operating (Service) Life - The MDM shall have a total operating
3.5.4.4.4.3.3.2.2.2
life of at least 50,000 hours with reasonable servicing and replacement of parts.
Specified Mean-Time-Between Failures (MTBF) - The Mean-
3.5.4.4.4.3.3.2.2.3
Time- Between Failures for the MDM shall be such as to allow Logic Unit 4 to meet it s specified
MTBF as stated in paragraph 3.3.2.4. To provide assurance that this requirement can be readily
achieved, a design goal of 4500 hrs shall be allocated to the MDM.
MDM Connectors - Power and signal connectors at the interface
3.5.4.4.3.3.2.3
between the MDM and Logic Unit 4 shall be in accordance with the requirements of MIL-C-81511.
Control Panel - The front panel of the MDM shall be an integral
3.5.4.4.4.3.3.2.4
part of the assembly and shall contain switches, controls, indicators and an air filter.
Interchangeability - The MDM shall meet the interchangeability
3.5.4.4.4.3.3.2.5
requirements of Specification MIL-E-5400.
Interference Control - When installed in the Logic Unit en-
3.5.4.4.4.3.3.2.6
closure, the generation of electromagnetic interference by the MDM and the susceptibility of the
equipment to electromagnetic interference shall be such as to permit Logic Unit 4 to meet the test
requirements given in 4.2.2.2.  To achieve this the design goals for the MDM for Electromagnetic
Interference shall be as follows:
261

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business