Click here to make tpub.com your Home Page

Page Title: Anti-disturbance function mode
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-E-48630(AR)
4.5.11 Anti-disturbance function mode.  After expiration of the
special delay period (dwg. 9342576), with the electronic assembly
under test connected to the test fixture so that its plane makes an
approximate 45 degree angle with the horizontal, the electronic lens
assembly shall be moved thru an arc of 90 degrees maximum about the
cylindrical axis.  Observation shall be made that the detonator
firing circuit turns on before the 90 degree rotation is complete.
Observation shall be made for compliance with the requirements of
3.5.2.  This is a non-destructive test.  All defects shall be rerun
at the end of the lot acceptance test, once, to verify the defect.
If a unit functions properly upon retest, it shall be classified as
an acceptable unit.
With the electronic assembly
4.5.12 Firing circuit energy.
under test connected to the test fixture, verify that the parallel
detonators firing circuits meet the requirements specified in
3.5.2.7.  This is a non-destructive test.  This test may be combined
with that of 4.5.7.
4.5.13 Magnetic target sensor functioning test.  The potted
electronic assembly shall be connected to approved test equipment
and tested for proper functioning of the magnetic sensor circuitry.
The electronic assembly shall be tested for the all-fire and no-fire
levels and firing angle specified on the drawing 9342576.
Countermeasure response and spurious outputs shall also be checked
at this assembly level.  Observation shall be made for compliance
with the applicable requirements of 3.5.3.  Non-destructive test.
4.5.14 Non-activated voltage.  Each battery cell shall be
checked for conformance with the requirements of 3.5.4 when measured
by a 10 megohm input impedance volt-meter.  Measurement shall be
made of each cell individually in the potted electronic assembly.
Non-destructive test.
4.5.15 Potting material testing.  Tests of the potting material
shall be done in accordance with drawing 9287148 and 4.4.3.2
herein.  Observation shall be made for compliance with requirements
of 3.3.2 and 4.4.3.2.
4.5.16 Shorting bar resistance.  The continuity - resistance of
each shorting bar circuit shall be measured, using an approved
ohmmeter, between the test points E3 and TP9.  Observation shall be
made for compliance with requirement of 3.5.6.  This is a
non-destructive test.  Acceptable parts may be returned to the lot.
50

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business