Click here to make tpub.com your Home Page

Page Title: Connector assembly, male
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
NOTE 2. - In establishing a curing time, dimensionally check ten
(10) parts from each cavity at periodic intervals (e.g. every
30, 60, etc. reins.) until dimensional stability is attained.  The
curing time will be from the time the part comes out of the mold
The inspection data used
until dimensional stability is attained.
in determining the curing time shall be sent to Picatinny Arsenal,
Dover, New Jersey, 07801 ATTN:  SMUPA-QA-A-M.  If any new change l
in material, cycle time, a reworked cavity, or a new cavity is
used, a new curing time shall be established and approved.
4.3.5.1 Connector assembly, male (see dwg. 9272095 covering
a detail of dwg. 9270787).
Minor:
None Defined
4.3.5.2 Case, right hand (see dwg. 9270795 covering a detail
of dwg. 9270787).
23

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business