Click here to make tpub.com your Home Page

Page Title: Table I. Conditioning Screen Requirements
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-F-48267 (PA)
DRAWINGS
U.S. ARMY MUNITIONS COMMAND
9255865
-
Fuze Timer
9278639
-
M56 Fuze Timer Static Test Load Card.
9278640
-
M56 Fuze Timer Burn - In Load Socket.
9278641
-
M56 Fuze Timer Dynamic Test Set.
(Copies of specifications, standards, drawings and publications
listed above required by suppliers in connection with specific
procurement functions should be obtained from the procuring ac-
tivity or as directed by the Contracting Officer).
REQUIREMENTS
3.
3.1 Material. - Materials shall be in accordance with
applicable specifications and drawings.
3.2 Part. - The part shall comply with all requirements
specified on drawing (dwg.) 9255865 and with all requirements
specified in applicable specifications.
3.3 Pre-Cap Visual, - The IC shall comply with the Pre-
cap requirements of MIL-STD-883.  Method 2010.1, Test Condition B.
3.4 Bond Strength. - The IC shall comply with the bond
strength requirements of MIL-STD-883, Method 2011, Test Condition
D.
3.5 Lead, Fatigue. - The IC shall comply with the lead
fatigue requirements of MIL-STD-883, Method 2004, Test Condition
B2
3.6 Conditioning Screen. - The IC shall be conditioned
through the following screening procedures in accordance with
Table No. 1 and MIL-STD-883.
2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business