3.14 Group C Environmental Requirements. - The IC shall
comply with the requirements of Table No. 6 and MIL-STD-883
3.15 Test Programming. - All final static electrical acceptance
testing shall be performed using Government tapes and load cards
described by 4.4.6, 4.4.7, and 4.4.8.
3.16 Workmanship. - All parts and assemblies shall be fab-
ricated and finished in a thorough, workmanlike manner. They
shall be free of cracks, surface defects, dirt, grease, rust, cor-
rosion products and other foreign matter. The cleaning agent or
method used shall not be injurious to any part, nor shall the part
be contaminated by the cleaning agent. All markings shall be neat
and sharply defined.
3.17 Submission of Results of Contractor Conducted Examina-
tions and Tests. - The contractor shall forward copies of the re-
sults of any of his examinations or tests to the designated address
as required by the contract. Results shall be submitted within
thirty (30) days at the completion of each lot tested (see 6.4).
|