Click here to make tpub.com your Home Page

Page Title: Post humidity operation.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-F-48673 (AR)
The test item
energized  only  a  sufficient  time  to  allow
shall be
the  required  warmupd
measurements  specified  in  the  equipment
specification.
9.  After completion of the fifth cycle with the test item in
the chamber and the chamber at 30 + 5C (860 + 9oF) and a
relative humidity of not less than 95%, take measurements specified
in the equipment test data sheets.
.
o
o
h.  Condition the test item at 250 + 5 C (770 + 9 F) and
50 + 5 percent relative humidity for not less than 12 hours nor more
than 24 hours.
While at 25 +
(770 + 9F) and 50 percent
i.
relative humidity, take measurements as specified in the equipment
test data sheets.
Inspect  test  item  to  detect  evidence  of  physical  degradation
j.
(such  as  corrosion  of  metal  parts,  distortion  of  plastic  parts,  and
when  visible  corrosion
insufficient  lubrication  of  moving  parts).
is  removed  by  suitable  Cleaningr tbe  equipment  shall,  as  a  result  of
the  cleaning,  be  returned  to  a  condition  which  conforms  to  the
requirements  of  preoperational  inspection  and  the  performance  of
the  equipment  shall  not  be  degraded.
4. 8.1.3.4.2 Post humidity operation.  At the completion of the
five humidity cycles, the FCC-FTS shall be removed from the humidity
chamber and subjected to the post operational performance tests in
accordance with paragraph 4S6.2 of this procedure as soon as
possible, but not later than one hour after completion of the
humidity test.  Prior to measurements, excess moisture may be
removed frm the exterior surfaces of the FCC-FTS by turning the
unit upside down or by wiping the external surfaces only.  Record
the results of this test on the applicable data sheet.
4. 8.1.3.4.3 Moisture test.  Following the above check for
satisfactory operation the FCC-FTS shall be opened and examined for
evidence of entrapped moisture.  Record the results of this
examination on the applicable data sheet.
4.8.1.4 Vibration.  FCC-FTS shall be subjected to the category
(h) and (g) tests required by MIL-STD-81O and MIL-T-28800. The
applicable tests are listed in Table XI-
46

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business