4 .5.35.3.2 Lot acceptance sample. If a total of five (5)
or more units do not meet the function time delays of 4.5.35.2 or
fail the charge circuit continuity test, the lot shall be
rejected.
Also, if one (1) or more failures are functions upon
S&A arming, or if three (3) or more failures are duds, the lot
shall be rejected. Functions upon S&A arming are failed units
that functioned at less than 1 sec after motor ignition. Duds
are failed units other than those that do not meet the function
time delays, or fail the charge circuit continuity test.
4.5.36 Data items. The contractor shall submit a
test/inspection report in accordance with 6.3 giving the detailed
test results.
PACKAGING
5.
5.1 Packaging.
The fuzes shall be packaged as specified on
Dwg . 9357775. Or , as alternate, packaging, packing and marking
shall comply with CFR49, Parts 100-199.
Fuzes shall be packed in accordance with Dwg.
Packing.
5.2
9357776.
Marking shall be in accordance with Dwg.
5.3 Marking.
8799112.
Data card information shall be
5.4 Ammunition data cards.
as specified in MIL-STD-1167.
NOTES
6.
(This section contains information of a general or explanatory
nature that may be helpful, but is not mandatory.)
6.1 Intended use. The fuze covered by this specification
is intended for use as part of the 2.75 Inch Rocket System.
6.2 Acquisition requirements.
Acquisition documents must
specify the following:
Title, number, and date of this specification.
a.
Issue of DODISS to be cited in the solicitation, and if
b.
required, the specific issue of individual documents
referenced (see 2.1.1).
Requirements for submission of first article sample.