| MIL-F-50253A (AR)
4,3 First Article Inspection.
4.3.1 Submission.- The contractor shall submit a first
article sample as designated by the Contracting Officer for
evaluation in accordance with provisions of 4.3,2. The first
article sample shall consist of the following items that are
applicable to this Contract in sample quantities as indicated:
4.3.2.1 Use of Simulated Defect Standards.- If automatic
radiographic inspection equipment is use d, it shall be validated
,
hourly using Design Agency approved standards containing simulated
defects and supplied by the contractor. These standards should be
representative of defects actually found or anticipated, The
contractor shall resupply the item standards when it is determined
by the Government that the standards are no longer representative
of the product.
4.3.2.2 Undetected Defect Standards.- Provisions shall be
established for the corrective action to be taken where the
equipment fails to identify a standard as defective. These
provisions shall include a reinspection of all acceptable material
subsequent to the last acceptable verification check as
minimum.
4.3.3
See MIL-A-48078.
Rejection.-
4
|