MIL-F-50532A(MI)
4.1.1 Submission of product. At the time each completed lot of items
deliverable under the contract is submitted to the Government for acceptance,
the contractor shall supply the following information accompanied by a
certificate which attests that the information provided is correct and
applicable to the product being submitted:
a.  A statement that the lot complies with all the quality
assurance provisions specified in this specification.
b.  Drawing and specification number and date, together with
identification and date of changes thereto.
c.  A statement that all material purchased by the contractor meets
requirements, when such material is controlled by Government or commercial
specifications referenced in any of the contractual documents, and that
certificates of conformance are on file and available for review, except
that statements of findings on the moisture content of the lead azide
and PETN shall be furnished with each lot submitted for acceptance.
d.
Number of items in the lot.
Date submitted.
e.
The certificate shall be signed by a responsible agent of the certifying
organization. The initial certificate submitted shall be substantiated
by evidence of the agent's authority to bind his principal. Substantiation
of the agent's authority will not be required with subsequent certificates
unless, during the course of the contract, this authority is vested in another
agent of the certifying organization.
4,2 First article inspection.
*
4.2.1 Submission.  The contractor shall submit a first article sample
as designated by the contracting officer for evaluation in accordance with
the provisions of 4.2.2. The first article sample shall consist of 60
complete fuzes, 125 detonator assemblies (dwg. 9240943), 15 base plate and
rotor assemblies less primer (dwg. 9252817), 15 sets of subassemblies (each
set of subassemblies shall consist of every subassembly covered by the
drawing package) and 15 complete sets of component parts (each set shall
consist of adequate components to fabricate a complete fuze) which have
been produced by the contractor or furnished by a supplier and which
have been manufactured using the same production processes, procedures
and equipment which will be used in fulfilling the contract. All parts
and materials, including packaging and packing, shall be obtained from
the same sources of supply as will be used in regular production. Prior
to submission, the contractor shall inspect the sample to the degree
necessary to assure that it conforms to the requirements of the contract
6