MIL-F-50994 (MU)
3.6 First article inspection. - This specification makes
provisions for first article inspection. Requirement for the sub-
mission of first article samples by the contractor shall be as
specified in the contract.
4.
QUALITY ASSURANCE PREVISIONS
4.1  Responsibility for inspection. - Unless otherwise speci-
fied in the contract or purchase order, the supplier is responsible
for the performance of all inspection requirements as specified
herein. Except as otherwise specified in the contract or order,
the supplier may use his own or any other facilities suitable for
the performance of the inspection requirements specified herein,
unless disapproved by the Government. The Government reserves
the right to perform any of the inspections set forth in the speci-
fication where such inspections are deemed necessary to assure
supplies and services conform to prescribed requirements.
4.1.1 Submission of product. - At the time each completed lot
of items deliverable under the contract is submitted to the Govern-
ment for acceptance, the contractor shall supply the following
information accompanied by a certificate which attests that the
information provided is correct and applicable to the product being
submitted:
a. A statement that the lot complies with all of the
quality assurance provisions specified in this specification.
b.  Drawing and specification number and date, together
with identification and date of changes thereto.
c.  A statement that all material purchased by the con-
tractor meets requirements, when such material is controlled by
Government or commercial specifications referenced in any of the
contractual documents, and that certificates of conformance are
on file and available for review.
d.  Number of items in the lot.
e.  Date submitted.
The certificate shall be signed by a responsible agent of the cer-
tifying organization. The initial certificate submitted shall be
substantiated by evidence of the agent's authority to bind his prin-
cipal. Substantiation of the agent's authority will not be required
with subsequent certificates unless, during the course of the con-
tract , this authority is vested in another agent of the certifying
organization.
4.1.2 Contractor inspection system. - As part of the contrac-
tor's approved quality procedure, there shall be a provision for
checking the adequacy of inspections made in connection with listed
critical or major defects. The procedures shall include the
following provisions:
5