| MIL-F-63428(AR)
d, Quality Conformance Inspection, if other than specified in
Section 4 of this specification.
e. First Article Sample requirements, if other than specified
in Section 4 of this specification.
f. Packaging requirements, if other than specified in Section 5
of this specification.
g. Certificates of conformance for each lot or shipment of
product and as specified in MIL-W-63150.
h. Spare parts required.
i.
Replacement parts schedules.
g. Marking requirements for shipment.
6.3 Submission of inspection equipment design for approval. See
MIL-W-63150. Equipment designs shall be submitted as required to:
Comnander, ARRADCOM, ATTN: DRDAR-QA-I, Dover, NJ 07801. Request
letter of submittal should state contractor, contract numbers
specification number, item nomenclature and classification of defects and
tests paragraph.
6.4 Submission of results of contractor-conducted examinations and
tests. Unless otherwise specified by the Contracting Officer, the
contractor sahll forward requested records of examinations or tests to
Commander, ARRADCOM, Dover, NJ 07801, ATTN: DRDAR-QAA-S.
6.5 Drawings. Drawings listed in SEction 2 of this specification
under the heading US Army Armament Research and Development Command
(ARRADCOM) may also include drawings prepared by and identified as
Edgewood Arsenal, Frankford Arsenal, Rock Island Arsenal, or Picatinny
Arsenal drawings. Technical data originally prepared by these activities
is now under the cognizance of ARRADCOM.
Preparing activity:
Custodian:
Army-AR
Army-AR
Project 1OO5-A6O1
56
|