|
| ![]() MIL-F-81150A(OS)
4.4.4.11.4 . 4.4. 4. 11.2 with the filter connected as specified
in 4.4.4.11.3. Again, maximum power dis sipation shall occur using a load
re si stance of 200,000 plus or minus 10,000 ohms.
4. 4. 4. 12 Visual and dimensional examination. Each bandpass filter shall
be examined to determine conformance with the requirements for workmanship
and dimensions.
4.4.4.13 Packaging, packing, and marking. Packaging, packing, and
marking shall comply with the requirements of Section 5.
4.5 Preproduction and periodic production inspection. The preproduc-
tion and periodic production samples, after satisfactorily passing the
quality conformance inspections detailed in 4.4, shall be subjected to
the following tests and examinations. Certified inspection data cover-
ing the results of preproduction and periodic production inspections shall
be forwarded to the procuring activity.
4.5.1 Vibration
4.5.1.1 Vibration, nonoperating. The bandpass filter, mounted as spec-
ified in Figure 3, shall be subjected to the "Vibration, nonoperating" test
of MIL-E-82590 and thereafter shall meet the requirements of 3.5.1.1.
4.5.1.2 Vibration, operating. The bandpass filter, mounted as specified
in Figure 3, shall be subjected to the "Vibration, operating" test of MIL-
E-82590 and during and thereafter shall meet the requirements of 3.5.1.2.
4-.5.1.3 Vibration, transportation. The bandpass filter shall be sub-
"
jetted to the Vibration, transportation" test of MIL-E-82590 and there-
after shall meet the requirements of 3.5.1.3.
4.5.2 Shock, transportation. The bandpass filter shall be subjected
to the "Shock, transportation test of MIL-E-82590 and thereafter shall
meet the requirements of 3.5.2.
4.5.3 Temperature and humidity
4.5.3.1 High temperature and humidity, nonoperating . The bandpass
filter shall be subjected to the "High temperature and humidity, non-
13
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |