Click here to make tpub.com your Home Page

Page Title: Responsibility for Inspection
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-F-81526B(AS]
3. 4.13.2 Semiautomatic Test, Fault Isolation Meter - These Film-Tapes,
..
..
starting at the rear end, shall be wound on a Spool with the message edge
of the film on the slotted end of the Spool.
The Film -Tape shall be wound
in a clockwise direction around the Spool (viewed from the slotted end) such
that the emulsion side of the Film-Tape is away from the spool.
4. QUALITY ASSURANCE PROVISIONS
4.1 Responsibility for Inspection - Unless otherwise specified in the
contract or purchase order, the supplier is responsible for the performance
of all inspection requirements as specified herein.
Except as otherwise
specified, the supplier may utilize his own facilities or any other commercial
laboratory acceptable to the Government. The Government reserves the
right to perform any of the inspections set forth in the specification where
.
such inspections are deemed necessary to assure supplies and services
conform to prescribed requirements.
Inspection records of the examination
and tests shallbe kept complete and available to the Government.
4.2 classification of Inspection - The inspection of production-copy Film -
Tapes shall be classified as follows:
a.
Preproduction tests
(4. 3)
b. Quality conformance tests (4.4)
4.3 Preproduction Tests - Preproduction tests shall be conducted on one
Film -Tape representative of the Film-Tape to be supplied under the
Tests shall be conducted at the contractor is plant under the
contract.
responsibility of contractor and in accordance with the approved test
procedures of 4.5.
The contractor shall inform the procuring activity
when tests are to be conducted so that a representative may be designated
to witness and monitor the tests, when so desired.
After completion of the
tests conducted at the contractor Is plant, the procuring activity may request
the shipment of the Film Tape tested to a Government facility for further
testing. The data obtained by the contractor in performing tests shall be

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business