|
| ![]() MIL-F-8615D
4.6 Safety analysis report. The safety analysis and proof-of-safety test
report shall be prepared as required by the specification, and the procure-
ment documents.
4.7 Reliability and maintainability. The reliability and maintainability
demonstration plans shall be delivered as required by the procurement
document.
PACKAGING
s.
5.1 Preservation and packaging. Unless otherwise specified in the item
specification, preservation, packaging, and packing shall be in accordance
with MIL-STD-794 (see 6.2).
5.2 Marking for shipment. In addition to any special marking required by
the contract or order, marking of individual packages and shipping containers
.
shall be in accordance with MIL-STD-129.
6.
NOTES
6.1 Intended use. Components covered by this specification are intended
for use in fuel and fuel vapor systems.
6.2
Procurement documents should specify:
Ordering data.
a. Title, number and date of item specification, and of specification control
drawing (3.1).
b. instructions concerning delivery of test reports and the test articles
to the procuring agency or the responsible engineering office (4.3).
Preparation for delivery instructions (5.1 and 5.2).
c.
d.
Instructions concerning delivery of sampling test data (4.4.2).
e. Instructions concerning delivery of reliability and maintainability
demonstration plans (4.7).
6.3 International standardization agreement. Certain provisions of this
specification regarding fuel pressures (3.6.1) and fuel compatibility (3.5)
are the subject of international standardization agreement ASCCAS 11/3B
and STANAG 3105. When amendment, revision, or cancellation of this speci-
fication is proposed which will affect or violate the international] agreement ,
concerned, the preparing activity will take appropriate reconciliation action
through international standardization channels, including departmental stand-
ardization offices, if required.
24
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |