|
| ![]() MIL-G-18853C(OS)
4.6.5 Test procedure for operating life, Connect the rate gyro and
confirm the power and current requirements as described in 45.3.b. through
g. After being subjected to the cycling procedure as set forth in 3.4,
the rate gyro shall be capable of performing as specified in 3.3.
Before the start of each cycle set forth in 3.4, the gyro motor
Note:
shall be allowed to coast to a stop.
5.
PREPARATION FOR DELIVERY
5.1 Preservation and packaging.
5.1.1 Level A.
5.1.1.1 Cleaning.
The rate gyro shall be cleaned in accordance with
MIL-P-116.
None required,
5.1.1.2 Preservation.
None required.
5.1.1.3 Unit packaging.
5.1.2 Level C. Cleaning, preservation, and packaging shall be in
accordance with 5.1.1.
5.2 Packing.
The rate gyro shall be packed in accordance with LD
5.2.1 Level A.
495855.
5.2.2 Level B.
The rate gyro shall be packed in accordance with LD
495855.
5.2.3 Level C. The rate gyro shall be packed to afford protection
against damage during direct shipment from the supply source to the
first receiving activity for immediate use. Containers shall comply
with Consolidated Freight Classification Rules or other common carrier
regulations applicable to the mode of transportation.
Marking of shipping containers shall be in accordance
5.3 Marking.
with LD 495855.
NOTES
6.
The rate gyro is intended to be used in Torpedo
6.1 Intended use.
Mk 37 Mods 2 and 3.
Procurement documents should specify the following:
6.2 Ordering data.
15
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |