MIL-G-46858A
d. Brief operating instructions
* 4.5 Acceptance tests. - All major units of the missileborne guidance and control
system shall be subjected to the following tests as described in 4.6:
a. Mechanical inspection tests ............................ (see 4.6.1)
b. Electrical tests................................................. (see 4.6.2)
c. Performance tests ............................................ (see 4.6.3)
4.5.1 Sampling for acceptance tests. - Lot size, sampling schedules, and rejection
limits for acceptance testing shall be in accordance with MIL-STD-105 as specified in
the detail specification.
4.6 Test methods.
* 4.6.1 Mechanical inspection tests. - All units of the missileborne guidance and control
system shall be given a thorough mechanical and visual inspection and test to
determine that the quality of all materials and workmanship is in compliance with the
requirements of this specification. (see Table II.)
* 4.6.2 Electrical tests. - Units of the missileborne guidance and control system shall be
given all electrical tests necessary to confirm that all circuits are inherently sound and
in compliance with the requirements of this specification. The electrical tests shall
include, but not necessarily be limited to those listed in 4.6.2.1 and 4.6.2.2.
* 4.6.2.1 Continuity. - Each electrical component and each wire and cable shall be
given a continuity test to ascertain if it is wired and connected correctly and that good
electrical contact is obtained.
4.6.2.2 Operating voltages. - The operating voltage at all important points shall be
checked for conformance to those shown on the circuit label and schematic drawing.
This shall be done with all controls set for normal equipment operation.
4.6.3 Performance tests. - The units of the guidance and control system shall be given
all performance tests necessary to confirm that the equipment meets the performance
requirements specified herein and in the applicable detail specifications.
4.7 Environmental tests. - Unless otherwise specified but the procuring activity (see
6.2), environmental tests of the system shall be performed in accordance with the test
methods of MIL-STD-810 and other applicable standards listed in Table III. The tests
shall be performed with all equipment properly interconnected. The parameters to be
checked, the methods of parameter measurement, and the test schedule shall conform
to the requirements of the detail specification.