Click here to make tpub.com your Home Page

Page Title: Examinations
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-G-82455(OS)
4.6.2 Acceptance tests and examinations. -
4.6.2.1 Examinations. -  The Generator shall be examined for
conformance to the requirements herein and on BuWeps drawing 2301891.
The non-conformance to the dimensions or requirements on BuWeps drawing
2301891 or the presence of any of the following constitutes a failure:
Evidence of reclaimed, used, or salvage parts
(a)
(b)
Safety pin not installed
Dents, scrapes, nicks, or other
(c)
by procuring activity
Evidence of parts missing
(d)
Evidence of improper assembly
(e)
Evidence of loose cap
(f)
Preservation-and packaging not as specified
(g)
in 5.1.
4.6.2.2 Tests.-
The samples selected in accordance with
4.6.1.2 shall be subjected to the tests of 4.6.2.2.1 and 4.6.2.2.2.
4.4.2.2
Leakage. -
4.6.2.2.1
The Generator shall be subjected
Function tests.-
4.6.2.2.2
to the function tests of 4.4.2.3 at room ambient temperature with the
longitudinal axis in the horizontal plane.
The following items of
4.6.2.3 Acceptance test equipment.-
test equipment or equivalent will be required to perform the acceptance
tests.
(a) See 4.4.3(e)
(b) See 4.4.3(f)
16

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business