MIL-G-85299(AS)
4.4 First article inspection.
4.4.1 First article samples.  First article tests shall be made on a test
set representative of the production test sets to be supplied under the
First article test performance shall be the responsibility of the
contract.
contractor and shall be performed in accordance with approved test procedures
(see 4.6).  No first article inspections shall be conducted prior to
acceptance of the first article test procedure by the contracting officer.
4.4.2 Scope of first article tests.  First article tests shall include all
tests deemed necessary by the procuring activity to determine that the test
set meets all the requirements of this specification and the contract.  These
shall include environmental and interference tests as specified in MIL-T-28800.
Environmental test methods shall be in accordance with MIL-T-28800 except as
modified by this specification.  Electromagnetic interference test methods
shall be in accordance with MIL-STD-462.
4.4.3 First article acceptance.  Acceptance of the first article will be
by the procuring activity upon the contractor meeting the requirements of all
tests.
4.4.4 Production equipments.  Test sets supplied under the contract shall,
in all respects including design, construction, workmanship, performance and
quality, be equal to the accepted first article sample. Each test set shall
be capable of successfully completing the same tests as imposed on the first
article sample.
Evidence-of non-compliance with the above shall constitute
cause for rejection of a test set and of a test set already accepted by the
Government.
The contractor shall make necessary corrections as authorized by
the procuring activity.
4.5  Quality conformance inspection.  The contractor shall furnish all samples
and shall be responsible for accomplishing the quality conformance tests.  All
inspection and testing shall be to the accepted quality conformance test
procedures under the supervision of the Government inspector. Quality
conformance or acceptance of material during the course of manufacture shall
not be construed as a guarantee of the acceptance of the finished product.
Tests shall consist of the following:
a.
Individual tests (see 4.5.1)
b.
Sample tests (see 4.5.2) or reliability assurance tests (see 4.5.3)
c.
Special tests (see 4.5.4)
d.
Life tests (see 4.5.6)
4.5.1 Individual tests.  Each test set made available for acceptance shall
be subjected to the individual tests.  These tests shall be adequate to
determine compliance with the requirements of material, workmanship,
operational adequacy and reliability.  As a minimum, each test set accepted
shall have passed the following tests: